ENERGY STAR VERSION 6 COMPLIANT INSTALLATION METHODS
(ES+) BEST PRACTICES
Complete Installation Document covering proper opening preparation and proper installation achieving successfull, long lasting weather management solutions.
(ES+) PROPER MEASUREMENT
– Width First, then Height
– Bow and Crown
– Level and Planar
– Plumb and Square
(ES-I) TOOLS – HARDWARE
– Hand Tools
– Power Tools
– Specialty Window Tools
– Screws, Anchors and Clips
(ES-II) WINDOW STYLES AND PARTS
– Window Anatomy
– Window Hardware
– Window Types and Styles
– Window Operating Types
(ES-IIIa) WINDOW REMOVAL 1
– Guidelines
– Frame-In or Frame-Out?
– Removing Wood Sash
– Removing Metal Sash
(ES-IIIb) WINDOW REMOVAL 2
– Taking the Old Frame Out
– Removing Steel Windows
– Removing Aluminum Windows
– Concrete/Masonry Tearout
(ES-IIIc) LEAD-SAFE INSTALL
– Proper Lead Testing and Notice
– Containment and Disposal
– EPA Rules(www.EPA.gov/lead)
– Equipment and Supplies
(ES-VI) PROPER SHIMMING
– Tapered Shims
– Stackable Shims
– Inflatable Shims
– Integral Shims and Buttefly Shims
(ES-VIII) APPLICATION VARIATIONS
– Wood Window- Frame In and FrameOut
– Aluminum Window – Frame In and Frame Out
– Steel Window – Frame In and Frame Out
– Install Variations
SINGLE/DOUBLE HUNG BOX FRAME
– Blind Stop
– Pocket Install
– Remove, Prepare, Install
– Wrapping the Opening
OUTSIDE-IN INSTALL
– Install Without Head Expander
– Dealing with Exterior Stop
– Sealing Inside and Outside
– Preserving Inside Trim
FRAME-IN v. FRAME-OUT
– How To Choose
– Proper Sealing for Each
– Measuring for Each
– Structural Considerations
STEEL WINDOW REPLACE
– Removing Frame from Masonry
– Leaving Old Frame In
– Jumping Frame
– Trim and Sealing Considerations
NEW CONSTRUCTION INSTALL
– Remodeling
– Flashing (Method A and Method B)
– Sill Pans
– Vapor Barrier
COASTAL REPLACEMENT
– Proper Removal
– Wood Surround/Mounting
– Dealing with the Gap
– Rebuild Opening
FRAME FIN MOUNT & J-CHANNEL
– Proper Flashing
– Proper Overlapping Flashing
– Foam Board Sheathing
– Integral J-Channel Install
JUMP FRAME INSTALL
– Stucco Frontal Flange
– Safe Removal of Old Window
– Proper Drip Cap
– Proper Perimeter Sealing
INSULATE SASH POCKETS FRAME
– Cure Drafts in Box Frame Install
– Insulate Sash Pockets
– Insulate Behind Jambs,
– Insulate Sill and Headers
WATER MANAGEMENT
– Divert, Drain and Dry
– Reconnecting the 5 Climate Barriers
– Impel Rods
– Barrier and Drainage Installation
NOTE: WIXSYS Content and Images Copyright 2012-2015. Used under license from AWDI, LLC. These instructions are for guidance only. Consulting and applying these instructions and practices will contribute to a successful installation, however the final responsibility for the outcome lies with the person(s) doing the actual work. Local codes and conditions will take precedence. Illustrations and Images are for reference only and may not match the Manufacturer’s Products. Refer to Manufacturers information for accurate product representations.